Construction Projects
Phase 1 (Completed)
Stupa Grounds land donated
44 Ton Stupa carved of granite in Portugal
Granite pieces shipped from Portugal and trucked to Stupa Grounds
Sacred objects and relics gathered in Nepal
Lopon Tashi relocated to El Pescadero
Our website was created
Two non-profit organizations established
Fundraising events organized and successfully completed
Concrete slab was poured for the teaching tent and the tent erected
Loan of $60,000 received
Airline tickets purchased for two Rinpoches, their attendants, and other stupa experts
Construction materials and equipment needed for the raising of the Stupa purchased
Phase 2
Install solar power on the property
Build a holding tank for water
Construct entry gates
Build two bathrooms
Landscape the Stupa area
Phase 3
Build a home for the Resident Lama
Build a privacy wall between the Residential Area and Stupa grounds
Build a permanent Community Center to accommodate 75 to 100 persons
Landscape the Residential area
Repay a $60,000 loan with minimum legal interest
Phase 4
Build a kitchen and dining area
Add gravel to the parking area
Build 3 small retreat bungalows
Build a garage/laundry/tool shed
Finish landscaping